• Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
  • Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
  • Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
  • Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
  • Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
  • Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment

Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment

After-sales Service: 1 Year
Warranty: 1 Year
Type: Hydraulic Pile Driver
Application: Pile Driver
Certification: CE, ISO9001: 2000
Condition: New
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Product Introduction
  • Construction feedback cases
  • The honors we have received
  • Our factory
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
GSF080
Vehicle Weight
4.6t
Hammer Head Pressure
20-22MPa
Pile Driving Speed
15-25s
Vehicle Wheelbase
2200mm
Speed
30-35km
Transport Package
Container/Wooden Box
Specification
4200*2150*2750mm
Trademark
LUJIA
Origin
Shangdong
Production Capacity
4000

Product Description

Product Introduction

The guardrail pile driver is a type of highway guardrail steel pipe pile driving equipment, which adopts diesel power and full hydraulic mechanical transmission. It has the characteristics of light driving, high pile driving accuracy, durability, energy conservation and environmental protection, and is particularly suitable for the installation, maintenance, and emergency repair of highway guardrails in field engineering construction.

 

 Preparation work
 
Before using the guardrail pile driver, some preparation work needs to be done. Firstly, it is necessary to ensure that the pile driver matches the power supply to avoid damaging the machine due to voltage mismatch. Secondly, it is necessary to clean the construction area to ensure that the guardrail pile driver can enter and exit freely.
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
 
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Install pile head
 
Install the pile head of the guardrail pile driver properly. The pile head should be installed on the base of the pile driver and ensure that the pile head is perpendicular to the ground, in order to drive the pile during the construction process.
 
Pile driving construction
 
Align the pile driver with the construction area, press the start button, and slowly bring the pile head closer to the ground. Then make adjustments to align the pile head with the target position. Press the start button again to turn on the guardrail pile driver, control the lifting and lowering of the pile head, and drive it into the ground until the set depth is reached. By continuously adjusting the angle of the pile head and mastering the speed of takeoff and landing, efficient and accurate pile driving construction can be achieved.
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Summary
 
The guardrail pile driver is a road guardrail construction equipment that can improve construction efficiency, reduce construction time and labor intensity. When using a guardrail pile driver, preparation work needs to be carried out and the correct usage methods should be followed to ensure construction quality and operational safety.



Multi use of one machine saves time and effort

Proficient in drilling and pulling, proficient in every aspect

 
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Fast pile driving in 8 seconds

 

Construction feedback cases

Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment


Model
 
JK-920
External dimensions
 
4200*2150*2750mm

Walking mode
 

Manual four-wheel drive
 

Engine power
 
38KW/51.68HP

Vehicle weight
 
4.6t
Speed
 
30-35km

Hammer head pressure
 
20-22mpa
Hammer head model
 
75

Tire model
 

20.5-16 wear-resistant steel wire tire
 

Hammer stroke
 
2200mm

Pile driving speed
 
15-25S
Working fuel consumption
 
3.5-4.5L/H

Vehicle wheelbase
 
2200mm
Vehicle wheelbase
 
1860mm

Hammer frequency
 
16hz
Hydraulic pump pressure
 
20-25mpa

Braking method
 

Oil brake
 

Chassis
 

Special chassis for pile driver
 
 
Model JK-926
External dimensions
 
4200*2150*2750mm

Walking mode
 

Automatic four-wheel drive
 

Engine power
 
42KW/57.12HP

Vehicle weight
 
4.6t Speed 30-35km

Hammer head pressure
 
20-22mpa
Hammer head model
 
75

Tire model
 

20.5-16 wear-resistant steel wire tire
 

Hammer stroke
 
2200mm

Pile driving speed
 
15-25S
Working fuel consumption
 
3.5-4.5L/H

Vehicle wheelbase
 
2200mm
Vehicle wheelbase
 
1860mm

Hammer frequency
 
16HZ
Hydraulic pump pressure
 
20-25mpa

Braking method
 

Air brake
 
Chassis
Special chassis for pile driver
 
 

The honors we have received

Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment 

Our factory

Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
 
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment
Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment

Packaging & Shipping

Construction Machinery, Multi Purpose Guardrail Pile Driver - Road Equipment

FAQ

Q: Can you accept special designs and specifications?
A: Of course you can. As is well known, traffic regulations vary in different regions, and our professional engineers will design according to the special requirements of customers, while well-trained employees will carry out production.


Q: What is your delivery time?
A: Usually, we conduct inventory of goods, and if we have inventory of products, the delivery time is 10-15 days after receiving the deposit.
If we don't have any inventory products, we will arrange production immediately and the delivery time is 30-45 days, depending on the order quantity.



Q: What can I buy from you?
Self dumping semi-trailer, box semi-trailer, container semi-trailer, low flatbed semi-trailer, automobile transportation semi-trailer, flatbed semi-trailer.
Truck cranes, oil tankers, mixer trucks, dump trucks, freight trucks, mining trucks, tractors.
Customized products, mechanical component products, tractors, agricultural machinery, etc.



Q: How is your product?
A:High quality products - every process of material selection, welding, sandblasting, and painting has undergone careful inspection, and has undergone 100% inspection during and after the process.


Q:Are you a factory? Can I trust your company?
A:Yes, we are the source factory. Our company was established in 1997 and has gone through more than 20 years of market development. Now, we have a high reputation in the industry and a good reputation.


Q:Why should I purchase from you instead of from other suppliers?
A:Competitive pricing - We are an industrial and trade enterprise that integrates the production and sales of Chinese automobile machinery manufacturers, as well as automobile maintenance and component processing.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Management System Certification
ISO 9001